Quiz Summary
0 of 69 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 69 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Frame Structures 0%
- Wood Frame Roofs, Interior/Exterior Finishes and Wood Stairs 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 69
1. Question
A corner post needs to be ____ mm shorter than the measured wall to accommodate vinyl siding.
CorrectIncorrect -
Question 2 of 69
2. Question
A corner post needs to be 6 mm shorter than the measured wall to accommodate ____.
CorrectIncorrect -
Question 3 of 69
3. Question
On a 7/16 OSB sheeted roof, ____ are used between roof truss members.
CorrectIncorrect -
Question 4 of 69
4. Question
On a 3/12 roof, the flashing around plumbing vents needs to extend ____ in all directions.
CorrectIncorrect -
Question 5 of 69
5. Question
The drop to line of flight is ____.
CorrectIncorrect -
Question 6 of 69
6. Question
When installing pocket doors it is important to ensure the following. Select all that apply (3/5)
CorrectIncorrect -
Question 7 of 69
7. Question
In reference to a bifold door, the finished opening must be ____ mm plus the door width.
CorrectIncorrect -
Question 8 of 69
8. Question
In reference to a bifold door, the finished opening must be 6 mm plus ____.
CorrectIncorrect -
Question 9 of 69
9. Question
A roof panel has a stamp that reads “2R24.” The number or letter that represents that the panel’s horizontal edges must be supported is ____.
CorrectIncorrect -
Question 10 of 69
10. Question
To properly install wood siding, the bottom should be at least ____ mm above finished grade.
CorrectIncorrect -
Question 11 of 69
11. Question
To properly install wood siding, the bottom should be at least 200 mm above ____.
CorrectIncorrect -
Question 12 of 69
12. Question
A two story house with a floor to floor measurement of 2540 mm has a unit rise for the stairs of 190 mm. The house requires ____ risers.
CorrectIncorrect -
Question 13 of 69
13. Question
A ____ sits directly over a gable.
CorrectIncorrect -
Question 14 of 69
14. Question
In reference to a bifold door, the finished opening must be ____ mm plus the door height.
CorrectIncorrect -
Question 15 of 69
15. Question
In reference to a bifold door, the finished opening must be 19 mm plus ____.
CorrectIncorrect -
Question 16 of 69
16. Question
The purpose of counter flashing is to ____.
CorrectIncorrect -
Question 17 of 69
17. Question
A closed cornice can be described as follows. Select all that apply (4/6)
CorrectIncorrect -
Question 18 of 69
18. Question
The minimum length of nails for joining a ledger strip to a wood beam is ____ mm.
CorrectIncorrect -
Question 19 of 69
19. Question
Which of the following are true about ledger strips? Select all that apply (3/5)
CorrectIncorrect -
Question 20 of 69
20. Question
The maximum unsupported height of an interior wall that does not have an attic accessible by a stairwell is three metres. The stud size is ____ mm.
CorrectIncorrect -
Question 21 of 69
21. Question
____ framing is a type of framing where studs in multi-story buildings can be very long.
CorrectIncorrect -
Question 22 of 69
22. Question
A carbon dioxide fire extinguisher is best used for ____.
CorrectIncorrect -
Question 23 of 69
23. Question
If the joists or rafters in a load bearing wall are directly over or within ____ mm of the edge of the wall studs, single top plates may be used.
CorrectIncorrect -
Question 24 of 69
24. Question
If the joists or rafters in a load bearing wall are directly over or within 50 mm of the edge of the wall studs, ____ may be used.
CorrectIncorrect -
Question 25 of 69
25. Question
____ can be poured or blown into place.
CorrectIncorrect -
Question 26 of 69
26. Question
A stub joist is a short joist that runs at ____ degrees to the regular joists.
CorrectIncorrect -
Question 27 of 69
27. Question
A(n) ____ is a short joist that runs at 90 degrees to the regular joists.
CorrectIncorrect -
Question 28 of 69
28. Question
The maximum unsupported height of a non-load bearing interior wall using a ____ stud size is 2.4 metres.
CorrectIncorrect -
Question 29 of 69
29. Question
Safety footwear protection is divided into ____ grades.
CorrectIncorrect -
Question 30 of 69
30. Question
There are 3 grades of ____ safety protection.
CorrectIncorrect -
Question 31 of 69
31. Question
Which of the following are true about rigid insulation? Select all that apply (3/5)
CorrectIncorrect -
Question 32 of 69
32. Question
Which of the following are true about cripple studs? Select all that apply (3/5)
CorrectIncorrect -
Question 33 of 69
33. Question
When pump jack scaffolds utilize wood, they must be braced every ___ m.
CorrectIncorrect -
Question 34 of 69
34. Question
Until guardrails can be reinstalled after being removed to allow for the hoisting of material, ____.
CorrectIncorrect -
Question 35 of 69
35. Question
A nail is required to be the minimum length of ____ mm when adjoining a wall plate to a stud.
CorrectIncorrect -
Question 36 of 69
36. Question
A nail is required to be the minimum length of 63 mm when adjoining a ____ to a stud.
CorrectIncorrect -
Question 37 of 69
37. Question
Individual vertical framing members best describes a ____.
CorrectIncorrect -
Question 38 of 69
38. Question
Which of the following are true about ceiling joists? Select all that apply (3/5)
CorrectIncorrect -
Question 39 of 69
39. Question
A covered walkway needs to be at least ____ metres tall to protect the public from construction sites.
CorrectIncorrect -
Question 40 of 69
40. Question
A ____ needs to be at least 2.5 metres tall to protect the public from construction sites.
CorrectIncorrect -
Question 41 of 69
41. Question
Which of the following are true regarding propane and propane tanks. Select all that apply (3/5)
CorrectIncorrect -
Question 42 of 69
42. Question
The maximum height for pump jack scaffolds using wood vertical posts is ____ m.
CorrectIncorrect -
Question 43 of 69
43. Question
At the point of entry of a scaffold a ____ represents that the scaffold is safe for use.
CorrectIncorrect -
Question 44 of 69
44. Question
Hazards within confined spaces can be which of the following? Select all that apply (4/5)
CorrectIncorrect -
Question 45 of 69
45. Question
The resistance to heat transfer is greater, the higher the ____.
CorrectIncorrect -
Question 46 of 69
46. Question
The metric equivalent of a ____ is 38 x 89.
CorrectIncorrect -
Question 47 of 69
47. Question
A metal strap or plate of at least ____ mm must be nailed across across joists in single top plates in load bearing walls.
CorrectIncorrect -
Question 48 of 69
48. Question
A ____ of at least 75 x 150 mm must be nailed across across joists in single top plates in load bearing walls.
CorrectIncorrect -
Question 49 of 69
49. Question
Ten ____ is the minimum level of temporary light required for construction.
CorrectIncorrect -
Question 50 of 69
50. Question
Construction hoarding is required when construction is not in an enclosed structure and is less than ____ meters from a sidewalk or public walkway.
CorrectIncorrect -
Question 51 of 69
51. Question
The primary purpose of a construction hoarding is ____.
CorrectIncorrect -
Question 52 of 69
52. Question
If a platform is higher than ____ meters, toe boards must be installed.
CorrectIncorrect -
Question 53 of 69
53. Question
If a platform is higher than 3.5 metres, ____ must be installed.
CorrectIncorrect -
Question 54 of 69
54. Question
An example of conduction is ____.
CorrectIncorrect -
Question 55 of 69
55. Question
____ meter(s) is the maximum spacing allowed for ladders used in ladder jack scaffolding.
CorrectIncorrect -
Question 56 of 69
56. Question
Three meters is the maximum spacing allowed for ____.
CorrectIncorrect -
Question 57 of 69
57. Question
The purpose of wall sheathing membranes is ____.
CorrectIncorrect -
Question 58 of 69
58. Question
The fastening of two lengths of 38 mm thick lumber is referred to as a ____.
CorrectIncorrect -
Question 59 of 69
59. Question
A support beam or girder which acts as a secondary support member to an existing structure is called a ____.
CorrectIncorrect -
Question 60 of 69
60. Question
If the height of a work platform does not exceed twice the shortest base dimension, only then it is safe to ____.
CorrectIncorrect -
Question 61 of 69
61. Question
A non-load bearing stud requires a minimum of ____ of untouched material.
CorrectIncorrect -
Question 62 of 69
62. Question
A ____ stud requires a minimum of 40 mm of untouched material.
CorrectIncorrect -
Question 63 of 69
63. Question
A building method that relies on heavy timbers rather than dimensional lumber is ____.
CorrectIncorrect -
Question 64 of 69
64. Question
To safety store ____, they must be in an upright position.
CorrectIncorrect -
Question 65 of 69
65. Question
What is the minimum width of a light duty scaffold platform?
CorrectIncorrect -
Question 66 of 69
66. Question
A scaffold should never be used in the following conditions. Select all that apply (5/6)
CorrectIncorrect -
Question 67 of 69
67. Question
A minimum stud standard or #3 grade is needed for ____.
CorrectIncorrect -
Question 68 of 69
68. Question
The metric equivalent of 38 x 89 is a ____?
CorrectIncorrect -
Question 69 of 69
69. Question
In order to convert ____, multiply the larger unit of measurement by 25.4.